5S Kit

IMPLEMENTATION KIT · VERSION 1.0

5S Implementation Kit: audit, rollout and control

A complete package for the shop floor: an Excel tool with a results dashboard, a step-by-step guide and printable forms. Free, no registration and no email required.

Download the whole kit (ZIP)Download files separately

ZIP · approx. 0.7 MB · Excel without macros · in English

What you get

40-question audit

Five pillars with eight questions each, 0–4 scale, criteria descriptions and examples. The score calculates itself.

Results dashboard

5S profile, trend, area ranking, target and warning threshold. You pick the area from a list.

Action plan and red tags

Every finding has an owner and a deadline. The tag register tracks the 7-day decision rule.

30/60/90-day rollout plan

A ready schedule of stages with progress in percent.

23-page guide

How to start, how to audit, how to sustain the result and which mistakes to avoid.

A4 and A3 forms

To print for the shop floor: audit card, tag, 5S board, results boards.

Download files

The whole kit in one ZIP fileAll 6 files below

Download

Excel tool (blank)40-question checklist, scoring sheet, results dashboard, action plan, tag register, audit schedule, 90-day plan. No macros.

Download

Excel tool with sample dataThe same file with 51 demo audits so you can see how the dashboard works.

Download

Implementation guide (PDF, 23 pages)How to run an audit, implement 5S in 90 days and sustain the standard.

Download

Guide (Word, editable)Editable version: adapt it to your plant.

Download

A4 forms to printAudit card, red tag, action plan, daily check list.

Download

A3 boards to print5S board, results and standards boards for the wall.

Download

Licence: internal use at one plant. Do not resell or publish all or part of it without the author’s consent. Excel 2016 or newer, or LibreOffice, required.

How the tool looks

5S results dashboard in Excel: profile, trend and area ranking

Results dashboard (demo data)

5S implementation guide page

Implementation guide

Printable 5S form

Printable form

Where to start: 5 steps

  1. Download the ZIP and open the guide (PDF).
  2. In the sheet Settings enter the names of your areas and auditors.
  3. Print the audit card and run your first audit in one area, together with the shift leader.
  4. Enter the scores in the sheet Scores and see the result on the dashboard.
  5. Complete the action plan and return to the area after 2–3 weeks.

Want to read first how it is done? 5S audit: how to run, implement and control it. For a quick online check there is also the 5S audit checklist.

Need a tool made to measure?

I can prepare a custom tool, template or implementation kit tailored to your plant: your own audit questions, your areas and logo, a sheet for a specific process. Just get in touch and describe in a few sentences what you need.

Write to me